EZ100 change-over front plate complete

Thanks to the change-over front, the foam ring can be replaced quickly and easily, or a blow flange can be fitted for the use of the air hose. If the foam ring is worn out, it is not necessary to loosen the bonded foam ring in a complex procedure. Simply remove the clamping ring and insert a new foam ring (art. 100279). The use of the air hose allows the device to be used in water-filled man hole. The EZ100 itself remains dry and gradually blows the water out of the pipe/man hole via the air hose. Scope of delivery: change-over front and foam ring Please order EZ100 hose flange (art. 100341) and air hose (art. 100120) separately.

Art. Nr.:100278
Shipping time

Europa + USA: 24 – 48 H
Canada, UAE, Asien: 48 – 72 H

In stock

Tarif N°: 8479.1020 / Origin: Swiss

Request quote

Description

Composed of: Change-over front, clamping ring and foam disc

This might also be of interest to you:

Other customers also bought: